This project for the Town of Stoughton includes demolition of a utility building, and construction of a new 14,000-square-foot highway garage and support building, renovating an existing 3,000-square-foot metal building, renovating and built-out an existing 5,300-square-foot CMU building and renovating a 9,200-square-foot, one-story workshop. The project took place in two phases and was coordinated around the activities of the fully occupied and operational facility.
Stoughton Public Works
![](https://www.ctaconstruction.com/wp-content/uploads/2024/05/Stoughton-DPW-01-951x625.jpg)
![](https://www.ctaconstruction.com/wp-content/uploads/2024/05/Stoughton-DPW-02-951x625.jpg)
![](https://www.ctaconstruction.com/wp-content/uploads/2024/05/Stoughton-DPW-03-951x625.jpg)
![](https://www.ctaconstruction.com/wp-content/uploads/2024/05/Stoughton-DPW-04-951x625.jpg)
Project Details
Location
Stoughton, MA
Size
32,000 sf
Type
Public Safety
Architect
Gannet Fleming
OPM
Town of Stoughton