Owner: 

Town of Wrentham

Architect: 

Allan M Leib Architects

Location: 

Wrentham, MA

CTA provided general contractor services for the addition and alterations of the existing Town Hall in Wrentham, MA. The new addition included a cast in place concrete vault, new elevator, bathrooms, a stairwell, and records storage area. The new addition was constructed of masonry bearing walls with brick veneer and poured in place concrete decks. The existing building construction consisted of a complete gut rehab including asbestos and hazardous material abatement. The renovated area houses offices, meeting rooms, record storage, a stairwell, and common spaces. The exterior brick received a complete rehab including cleaning and repointing of existing brick. The exterior included an entrance canopy constructed of Architecturally Exposed Structural Steel.